Summary Tennessee Valley Authority (TVA) is a corporate agency providing electricity for business customers, local power companies and distributors. The agency generates power using diverse sources of energy such as hydro, nuclear, coal, diesel generator and other renewable based power plants. TVA provides flood control, navigation and land management for the Tennessee River System. It manages the river system to provide recreational opportunities, improved water quality, adequate water supply, natural resource protection, and economic development for local power companies and state and local governments. The agency, as a wholesale power supplier, sells power to distributor customers such as municipalities and cooperatives. TVA is headquartered in Knoxville, Tennessee, the US. Tennessee Valley Authority - Power - Deals and Alliances Profile provides you comprehensive data and trend analysis of the company's Mergers and Acquisitions (M&As), partnerships and financings. The report provides detailed information on Mergers and Acquisitions, Equity/Debt Offerings, Private Equity, Venture Financing and Partnership transactions recorded by the company over a five year period. The report offers detailed comparative data on the number... Research Beam Model: Research Beam Product ID: 2032607 250 USD New
Tennessee Valley Authority - Power - Deals and Alliances Profile
 
 

Tennessee Valley Authority - Power - Deals and Alliances Profile

  • Category : Energy and Power
  • Published On : August   2017
  • Pages : 154
  • Publisher : GlobalData
 
 
 
Summary

Tennessee Valley Authority (TVA) is a corporate agency providing electricity for business customers, local power companies and distributors. The agency generates power using diverse sources of energy such as hydro, nuclear, coal, diesel generator and other renewable based power plants. TVA provides flood control, navigation and land management for the Tennessee River System. It manages the river system to provide recreational opportunities, improved water quality, adequate water supply, natural resource protection, and economic development for local power companies and state and local governments. The agency, as a wholesale power supplier, sells power to distributor customers such as municipalities and cooperatives. TVA is headquartered in Knoxville, Tennessee, the US.

Tennessee Valley Authority - Power - Deals and Alliances Profile provides you comprehensive data and trend analysis of the company's Mergers and Acquisitions (M&As), partnerships and financings. The report provides detailed information on Mergers and Acquisitions, Equity/Debt Offerings, Private Equity, Venture Financing and Partnership transactions recorded by the company over a five year period. The report offers detailed comparative data on the number of deals and their value categorized into deal types, sub-sector and regions.

GlobalData derived the data presented in this report from proprietary in-house Power eTrack deals database, and primary and secondary research.

Scope

- Financial Deals - Analysis of the company's financial deals including Mergers and Acquisitions, Equity/Debt Offerings, Private Equity, Venture Financing and Partnerships.
- Deals by Year - Chart and table displaying information encompassing the number of deals and value reported by the company by year, for a five year period.
- Deals by Type - Chart and table depicting information including the number of deals and value reported by the company by type such as Mergers and Acquisitions, Equity/Debt Offering etc.
- Deals by Region - Chart and table presenting information on the number of deals and value reported by the company by region, which includes North America, Europe, Asia Pacific, the Middle East and Africa and South and Central America.
- Deals by Sub-sector - Chart and table showing information on the number of deals and value reported by the company, by sub-sector.
- Major Deals - Information on the company's major financial deals. Each such deal has a brief summary, deal type, deal rationale; and deal financials and target Company’s (major public companies) key financial metrics and ratios.
- Business Description - A brief description of the company's operations.
- Key Employees - A list of the key executives of the company.
- Important Locations and Subsidiaries - A list and contact details of key centers of operation and subsidiaries of the company.
- Key Competitors - A list of the key competitors of the company.
- Key Recent Developments - A brief on recent news about the company.

Reasons to Buy

Get detailed information on the company's financial deals that enable you to understand the company's expansion/divestiture and fund requirements
- The profile enables you to analyze the company's financial deals by region, by year, by business segments and by type, for a five year period.

Understand the company's business segments' expansion / divestiture strategy
- The profile presents deals from the company's core business segments' perspective to help you understand its corporate strategy.

Access elaborate information on the company's recent financial deals that enable you to understand the key deals which have shaped the company
- Detailed information on major recent deals includes a summary of each deal, deal type, deal rationale, deal financials and Target Company's key financial metrics and ratios.

Equip yourself with detailed information about the company’s operations to identify potential customers and suppliers.
- The profile analyzes the company's business structure, locations and subsidiaries, key executives and key competitors.

Stay up-to-date on the major developments affecting the company
- Recent developments concerning the company presented in the profile help you track important events.

Gain key insights into the company for academic or business research
- Key elements such as break up of deals into categories and information on detailed major deals are incorporated into the profile to assist your academic or business research needs.

Note*: Some sections may be missing if data is unavailable for the company.
Table of Contents
Table of Contents 3
List of Tables 7
List of Figures 7
Tennessee Valley Authority, Power, Deals By Year, 2011 to YTD 2017 8
Tennessee Valley Authority, Power Deals By Type, 2011 to YTD 2017 9
Tennessee Valley Authority, Power, Deals By Region, 2011 to YTD 2017 10
Tennessee Valley Authority, Power, Deals By Sector, 2011 to YTD 2017 11
Tennessee Valley Authority, Power, Deals Summary, 2011 to YTD 2017 12
Tennessee Valley Authority, Power, Deal Details 13
Asset Purchase 13
Tennessee Valley Authority Completes Acquisition of Quantum Choctaw Gas Fired Power Plant in Mississippi, US from Quantum Utility Generation 13
Tennessee Valley Invests US$790 Million In John Sevier Power Plant In Northeast Tennessee, US 14
Tennessee Valley Acquires Magnolia Gas Power Plant From Kelson For US$436 Million In US 15
TVA To Invest US$6 Million For Solar PV Project In Kentucky, US 16
Tennessee Valley Authority Completes Lease Financing Of US$400 Million For The Acquisition Of Southaven Gas Fired Combined Cycle Plant In Mississippi, US From Seven States Southaven 17
Debt Offering 18
Tennessee Valley Authority Prices Public Offering of 2.875% Bonds Due 2027 for USD1 Billion 18
Tennessee Valley Authority Completes Public Offering Of 1.75% Bonds Due 2018 For US$1 Billion 19
Tennessee Valley Completes Public Offering Of 1.875% Notes Due 2022 For US$1 Billion 20
Asset Transactions 21
Nuclear Development to Acquire Bellefonte Nuclear Power Plant in Alabama, US from Tennessee Valley Authority for USD111 Million 21
Tennessee Valley Authority - Key Competitors 22
Tennessee Valley Authority - Key Employees 23
Tennessee Valley Authority - Locations And Subsidiaries 24
Head Office 24
Other Locations & Subsidiaries 24
Recent Developments 25
Aug 23, 2017: TVA Budget Remains Flat for FY 2018; Debt Reduction a Focus 25
Aug 21, 2017: Federal court will handle the US State of Tennessee's coal ash case 26
Aug 21, 2017: Energy efficiency program improves 139 homes in Columbus city, US 27
Aug 17, 2017: NRC Names New Senior Resident Inspector at Sequoyah Nuclear Plant 28
Aug 16, 2017: NRC Approves Extended Power Uprate for Browns Ferry Nuclear Plant 29
Aug 14, 2017: International Safety Review Team Visits Sequoyah Nuclear Power Plant 30
Aug 04, 2017: U.S. District Judge Rules TVA Must Move Gallatin Coal Ash 31
Aug 01, 2017: TVA's Financial Position Continues to be Strong 32
Jul 28, 2017: NRC Issues TVA Confirmatory Order to Address Safety Conscious Work Environment Issues 33
Jul 21, 2017: TVA Environmental Assessment Supports Dewatering Facility at Gallatin 34
Jun 25, 2017: Environmental groups oppose Tennessee Valley Authority's plan of developing small modular reactors in Oak Ridge, US 35
Jun 02, 2017: Sequoyah Unit 2 Completes Refueling and Maintenance Outage 36
May 11, 2017: TVA Board Approves $300 Million Strategic Fiber Initiative 37
May 10, 2017: Watts Bar Unit 1 Returns to Power Generation for the Tennessee Valley 38
May 02, 2017: TVA Efficiency Efforts Increase Net Income 39
Apr 28, 2017: TVA Plans Storage for Coal Ash and Coal Combustion Residuals at Bull Run 40
Apr 28, 2017: Tennessee Valley Authority’s Sequoyah Unit 2 Begins Scheduled Refueling, Maintenance Outage 41
Apr 25, 2017: TVA Installing Solar Site in Memphis 42
Apr 24, 2017: NRC To Conduct Open House to Discuss 2016 Performance of Browns Ferry Nuclear Plant 43
Apr 13, 2017: Tennessee Valley Authority: Paradise Combined Cycle Plant Goes into Commercial Operation 44
Apr 10, 2017: TVA Identifies Preferred Route for new Transmission Line 45
Apr 04, 2017: NRC Announces Hearing Opportunity on Clinch River Early Site Permit 46
Apr 03, 2017: NRC To Conduct Open House to Discuss 2016 Performance of Sequoyah Nuclear Plant 47
Mar 31, 2017: Browns Ferry Unit 2 Completes Refueling and Maintenance Outage 48
Mar 28, 2017: TVA Invites Public Comments on Plans for Dry Ash Storage at Paradise 49
Mar 23, 2017: TVA Seeks Public Comment on Gallatin Coal Ash Facility 50
Mar 23, 2017: Watts Bar Unit 2 Shutdown Due To Condenser Failure 51
Mar 20, 2017: Tennessee Valley Authority’s Watts Bar Unit 1 Begins Scheduled Refueling, Maintenance Outage 52
Mar 13, 2017: TVA Seeks Public Comment on Proposed Transmission Projects 53
Feb 27, 2017: Browns Ferry Unit 2 Begins Scheduled Refueling and Maintenance Outage 54
Feb 17, 2017: EPB starts construction on Solar Share community solar project 55
Feb 16, 2017: Richard Howorth Selected TVA Board Chair-Elect 56
Jan 31, 2017: TVA Reports Strong First Quarter Financial Performance 57
Jan 30, 2017: U.S. environmental groups claim TVA for polluting Cumberland river 58
Jan 23, 2017: Tennessee Valley Authority: Public Input Sought for Transmission System Environmental Review 59
Jan 19, 2017: V. Lynn Evans Named TVA Board Chair 60
Jan 13, 2017: Areva to supply refueling equipment upgrades to TVA Reactors in US 61
Jan 13, 2017: TVA Clears Next Hurdle for Small Modular Reactors 62
Jan 12, 2017: NRC accepts application for early site permit at Clinch River Site In Tennessee 63
Jan 09, 2017: TVA Names Mike Balduzzi as Chief Nuclear Officer 64
Jan 05, 2017: TVA completes maintenance outage at Sequoyah nuclear unit 1 in US 65
Jan 04, 2017: TVA Employees Get Ready for Year’s First Cold Snap 66
Dec 23, 2016: First new U.S. nuclear reactor in almost two decades set to begin operating 67
Dec 09, 2016: TVA seeks public opinion on Cumberland power plant’s coal residual storage 68
Dec 05, 2016: TVA Seeks Public Input on Projects at Cumberland Fossil Plant 69
Dec 01, 2016: TVA Proposes New Storage for Coal Combustion Residuals at Bull Run 70
Dec 01, 2016: TVA Seeking Public Input on Draft Environmental Assessment For New Transmission Line 71
Nov 29, 2016: NRC Proposes $140,000 Fine for Violation at Browns Ferry Nuclear Plant 72
Nov 28, 2016: Sequoyah Unit 1 Begins Scheduled Refueling, Maintenance Outage 73
Nov 18, 2016: TVA, NextEra Energy Resources Celebrate Commissioning of Alabama’s Largest Solar Energy Project 74
Nov 17, 2016: TVA Economic Development Efforts Drive Record Investment During FY 2016 75
Nov 15, 2016: TVA Reports Record Net Income for Fiscal Year 2016 76
Nov 14, 2016: TVA Completes Bellefonte Sale 77
Nov 14, 2016: Nuclear Development, LLC Enters into Contract to Purchase Bellefonte Nuclear Power Plant 78
Nov 10, 2016: TVA Delivers on Its Mission of Serving the People of the Tennessee Valley 79
Nov 04, 2016: Browns Ferry Unit 1 Successfully Completes Outage 80
Nov 02, 2016: TVA’s Unit 2 at Watts Bar nuclear plant returns to service 81
Nov 01, 2016: Utilities Partner to Enhance Power Grid Preparedness 82
Nov 01, 2016: TVA Crews Install New High Voltage Transmission Lines in Oxford 83
Oct 26, 2016: NRC Schedules Meeting with TVA to Discuss Work Environment at Watts Bar 84
Oct 24, 2016: Southern Company, TVA Sign Mutual Aid Agreement to Help Restore Power After Significant Events 85
Oct 19, 2016: TVA’s Watts Bar Unit 2 Achieves Commercial Operation 86
Oct 07, 2016: Combustion Testing Begins at Paradise CC Plant 87
Oct 03, 2016: Watts Bar Unit 2 Completes Power Ascension Testing Requirements 88
Oct 03, 2016: TVA’s Browns Ferry 1 nuclear power unit shuts down for refueling outage 89
Sep 30, 2016: TVA's Unit 2 at Watts Bar nuclear power plant attains 100% power capacity 90
Sep 29, 2016: TVA Seeks Public Comment on Options for New Knoxville Headquarters 91
Sep 26, 2016: Watts Bar Nuclear Unit 2 Resumes Testing 92
Sep 22, 2016: TVA President and CEO Bill Johnson Promotes Leaders 93
Sep 15, 2016: TVA Environmental Assessment Supports Dewatering Facility at Shawnee 94
Sep 12, 2016: Sequoyah Exercise Tests Coordination of TVA, Federal, State and Local Agencies 95
Aug 25, 2016: TVA Reduces Budget Requirements and Continues Investment in Cleaner Power 96
Aug 16, 2016: Huntsville Utilities CEO Stowe To Lead TVA’s New Green Energy Group 98
Aug 03, 2016: TVA finishes second controlled shutdown of Watts Bar Unit 2 99
Aug 02, 2016: TVA Reports Third Quarter FY 2016 Financial Results 100
Jul 29, 2016: TVA Decides Coal Combustion Residuals More Safely Stored In Place 101
Jul 27, 2016: TVA Seeks Comments on Solar Project 102
Jul 26, 2016: General Atomics Radiation Monitoring Systems Operating at New U.S. Nuclear Power Plant 103
Jul 25, 2016: TVA Helps Airports, FedEx Achieve Cleaner Air 104
Jul 19, 2016: TVA Seeking Public Input on Future of Colbert Fossil Plant 105
Jul 18, 2016: Concentric Energy Advisors, Inc. Announces Process for Bellefonte Nuclear Plant Sale 106
Jul 18, 2016: Testing Nation’s Newest Nuclear Generation to Ensure Safety, Quality and Reliability 107
Jul 05, 2016: TVA Identifies Preferred Route for Future Transmission Line 108
Jun 28, 2016: Westinghouse Fleet Expands With Tva’s Watts Bar Unit 2 109
Jun 21, 2016: Elevated tritium found at TVA’s Browns Ferry nuclear plant well 110
Jun 15, 2016: TVA Seeks Public Comment on Shawnee Coal Ash Dry Storage Facility 111
Jun 13, 2016: TVA Proposes Closure-in-Place for Coal Combustion Residuals 112
Jun 06, 2016: TVA’s Watts Bar 2 nuclear unit shuts down automatically 113
Jun 03, 2016: Watts Bar Unit 2 Produces Electricity for the First Time 114
May 26, 2016: NRC Announces Public Availability of Clinch River Early Site Permit Application 115
May 25, 2016: TVA recognizes MTEMC EnergyRight Solutions efforts 116
May 23, 2016: Watts Bar Unit 2 Operates Under Own Power for First Time 117
May 18, 2016: Paul Simmons Named Watts Bar Site Vice President 118
May 18, 2016: TVA Seeking Comments on Proposed Ash Storage at Bull Run Fossil Plant 119
May 13, 2016: TVA Submits Early Site Permit Application For Clinch River SMRs 120
May 12, 2016: TVA Seeks Public Comments on Two Solar Projects 121
May 09, 2016: TVA Identifies Preferred Route for Power Line Near Guthrie 122
May 04, 2016: Jacobs Wins Construction Management Contract for Tennessee Valley Authority 123
May 03, 2016: TVA Reports Second Quarter Financial Results 124
May 02, 2016: TVA Invites the Public to Ackerman Gas Plant Dedication 125
May 02, 2016: Brewer Named TVA’s Chief Communications and Marketing Officer 126
Apr 27, 2016: NRC Schedules Open House to Discuss 2015 Performance at Watts Bar Nuclear Plant 127
Apr 25, 2016: ABB FACTS solution to help maintain grid stability as power generation mix changes 128
Apr 21, 2016: Public Input on Potential Bellefonte Sale Available Online: Tennessee Valley Authority 129
Apr 18, 2016: TVA and Silicon Ranch Partner on Large-Scale Solar Farm at NSA Mid-South 130
Apr 14, 2016: NRC Schedules Open House and Meeting to Discuss Assessment of Sequoyah Nuclear Plant and NRC Research Analyzing Unlikely Accidents 131
Apr 13, 2016: NRC Schedules Open House to Discuss Agency’s 2015 Assessment of Browns Ferry Nuclear Plant 132
Apr 06, 2016: TVA Environmental Review Supports Dewatering Facility at Kingston 133
Mar 29, 2016: TVA Awards 16.7 Megawatts of Solar Capacity through Distributed Solar Solutions 134
Mar 29, 2016: NRC Meetings April 12 in Oak Ridge, Tenn., to Discuss Review Process for Early Site Permit Application 135
Mar 28, 2016: Browns Ferry Unit 3 Completes Refueling and Maintenance Outage 136
Mar 24, 2016: Colbert Fossil Plant Ends 61 Years of Electrical Generation: Tennessee Valley Authority 137
Mar 17, 2016: NRC Schedules Meeting with TVA to Discuss Watts Bar Nuclear Plant Work Environment 138
Mar 16, 2016: Westinghouse Captures TVA Fleet Contract 139
Mar 01, 2016: Savings on TVA Fuel Costs Shared with Consumers 140
Feb 25, 2016: Environmental Review Supports Transmission Project in Van Buren County, Tennessee 141
Feb 22, 2016: Browns Ferry Unit 3 Begins Scheduled Refueling & Maintenance Outage 142
Feb 19, 2016: Geotechnical Core Drilling Begins at Chickamauga Dam: TVA 143
Feb 18, 2016: Westinghouse to provide outage services for Tennessee Valley Authority's nuclear plants 144
Feb 13, 2016: TVA abandons construction of two reactors at Bellefonte nuclear power plant in Alabama 145
Feb 11, 2016: Ritch To Continue As Board Chair: Tennessee Valley Authority 146
Feb 09, 2016: Gallatin Dry Scrubbers Fully Operational: TVA 147
Feb 05, 2016: TVA Extends Public Comment Period on Closure of Coal Impoundments 148
Feb 03, 2016: Mild Weather Impacts TVA’s First Quarter Earnings 149
Feb 03, 2016: TVA’s cost for Watts Bar 2 nuclear power unit increases to $4.7bn 150
Feb 02, 2016: TVA completes first phase of repairs at Boone Dam 151
Jan 16, 2016: TVA requests comments on proposed solar power purchase agreement in Tennessee 152
Jan 09, 2016: Tennessee Valley Authority to begin work on natural gas-fired power plant in Memphis 153
Appendix 154
Methodology 154
About GlobalData 154
Contact Us 154
Disclaimer 154

List of Tables
Tennessee Valley Authority, Power, Key Facts, 2016 2
Tennessee Valley Authority, Power, Deals Summary, 2011 to YTD 2017 2
Tennessee Valley Authority, Power, Deals By Year, 2011 to YTD 2017 8
Tennessee Valley Authority, Power Deals By Type, 2011 to YTD 2017 9
Tennessee Valley Authority, Power, Deals By Region, 2011 to YTD 2017 10
Tennessee Valley Authority, Deals By Sector, 2011 to YTD 2017 11
Tennessee Valley Authority, Power, Deals Summary, 2011 to YTD 2017 12
Tennessee Valley Authority Completes Acquisition of Quantum Choctaw Gas Fired Power Plant in Mississippi, US from Quantum Utility Generation 13
Tennessee Valley Invests US$790 Million In John Sevier Power Plant In Northeast Tennessee, US 14
Tennessee Valley Acquires Magnolia Gas Power Plant From Kelson For US$436 Million In US 15
TVA To Invest US$6 Million For Solar PV Project In Kentucky, US 16
Tennessee Valley Authority Completes Lease Financing Of US$400 Million For The Acquisition Of Southaven Gas Fired Combined Cycle Plant In Mississippi, US From Seven States Southaven 17
Tennessee Valley Authority Prices Public Offering of 2.875% Bonds Due 2027 for USD1 Billion 18
Tennessee Valley Authority Completes Public Offering Of 1.75% Bonds Due 2018 For US$1 Billion 19
Tennessee Valley Completes Public Offering Of 1.875% Notes Due 2022 For US$1 Billion 20
Nuclear Development to Acquire Bellefonte Nuclear Power Plant in Alabama, US from Tennessee Valley Authority for USD111 Million 21
Tennessee Valley Authority, Key Competitors 22
Tennessee Valley Authority, Key Employees 23
Tennessee Valley Authority, Other Locations 24
List of Figures
Tennessee Valley Authority, Power, Deals by Type, 2011 to YTD 2017 2
Tennessee Valley Authority, Power, Deals By Year, 2011 to YTD 2017 2
Tennessee Valley Authority, Power, Deals By Region, 2011 to YTD 2017 2
Tennessee Valley Authority, Power, Deals By Sector, 2011 to YTD 2017 2
Tennessee Valley Authority, Power, Deals By Year, 2011 to YTD 2017 8
Tennessee Valley Authority, Power, Deals by Type, 2011 to YTD 2017 9
Tennessee Valley Authority, Power, Deals By Region, 2011 to YTD 2017 10
Tennessee Valley Authority, Power, Deals by Sector, 2011 to YTD 2017 11
PURCHASE OPTIONS
 
 
 

How can we help you?

Contact us at the Consulting WP office nearest to you or submit a business inquiry online.


  Contact
 

Subscribe to Our Newsletter

 
 

Related Reports