Report Overview
About Data Center Construction
Data centers are data storage and processing solutions that are either physical/ virtual or remote location-based facilitating enterprises to enhance their operations. The increase in the use of big data analytics, cloud-based services, and the Internet of things (IoT) has aided the growth in the construction of data centers worldwide. In terms of data center operations, the US is the largest country, followed by the European countries such as the UK and Germany.
Technavio’s analysts forecast the data center construction market in the Nordic region to grow at a CAGR of 16.72% during the period 2017-2021.
Covered in this report
The report covers the present scenario and the growth prospects of the data center construction market in the Nordic region for 2017-2021. To calculate the market size, the report considers the revenue generated from the investments made in new data centers.
The market is divided into the following segments based on geography:
• Finland and Iceland
• Denmark
• Norway
• Sweden
Technavio's report, Data Center Construction Market in the Nordic Region 2017-2021, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.
Key vendors
• AECOM
• Arup Associates
• DPR Construction
• Mercury Engineering
• NCC
• Skanska
Other prominent vendors
• Coromatic
• Enaco Sverige
• MDC Stockholm
• Nordisk Kombination Arkitekter
• Rittal
• Schneider Electric
• SRV Group
• Sweco
Market driver
• Reduction in OPEX
• For a full, detailed list, view our report
Market challenge
• Lack of construction and operational expertise
• For a full, detailed list, view our report
Market trend
• Adoption of energy-efficient infrastructure
• For a full, detailed list, view our report
Key questions answered in this report
• What will the market size be in 2021 and what will the growth rate be?
• What are the key market trends?
• What is driving this market?
• What are the challenges to market growth?
• Who are the key vendors in this market space?
• What are the market opportunities and threats faced by the key vendors?
• What are the strengths and weaknesses of the key vendors?
You can request one free hour of our analyst’s time when you purchase this market report. Details are provided within the report.
Table Of Contents
Table Of Contents
PART 01: Executive summary
PART 02: Scope of the report
PART 03: Research Methodology
PART 04: Introduction
• Market outline
PART 05: Market landscape
• Market overview
• Market size and forecast
• Five forces analysis
PART 06: Market segmentation by construction
• Electrical construction
• General construction
• Mechanical construction
PART 07: Electrical construction: Market segmentation
• UPS
• Generator
• Transfer switch and switchgear
• Rack PDU
• Others
PART 08: Market segmentation by mechanical construction
• Cooling solutions
• Racks
• Others
PART 09: Market segmentation by tier standards
• Tier 1
• Tier 2
• Tier 3
• Tier 4
PART 10: Market segmentation by country
• Denmark
• Norway
• Sweden
• Finland and Iceland
PART 11: Decision framework
PART 12: Drivers and challenges
• Market drivers
• Market challenges
PART 13: Market trends
PART 14: Vendor landscape
• Competitive Analysis
• AECOM
• Arup Associates
• DPR Construction
• Mercury Engineering
• NCC
• Skanska
• Other prominent vendors
PART 15: Appendix
• List of abbreviations
List of Exhibits
Exhibit 01: Data center site selection criteria
Exhibit 02: Data center construction cost analysis (in $)
Exhibit 03: Average temperature in the Nordic region (in Fahrenheit)
Exhibit 04: Data center construction market in the Nordic region 2016-2021 ($ billions)
Exhibit 05: Five forces analysis
Exhibit 06: Data center construction market in the Nordic region by construction 2016-2021 (% share)
Exhibit 07: Data center construction market in the Nordic region by electrical construction 2016-2021 ($ billions)
Exhibit 08: General construction: Services included
Exhibit 09: Data center construction market in the Nordic region by general construction 2016-2021 ($ billions)
Exhibit 10: Data center construction market in the Nordic region by mechanical construction 2016-2021 ($ billions)
Exhibit 11: Data center construction market in the Nordic region: by electrical construction 2016-2021 (% share)
Exhibit 12: Data center construction market in the Nordic region by electrical construction 2016-2021 ($ billions)
Exhibit 13: Data center construction market in the Nordic region by UPS 2016-2021 ($ billions)
Exhibit 14: Data center construction market in the Nordic region by generators 2016-2021 ($ billions)
Exhibit 15: Data center construction market in the Nordic region by transfer switch and switchgear 2016-2021 ($ billions)
Exhibit 16: Data center construction market by rack PDU 2016-2021 ($ billions)
Exhibit 17: Data center construction market in the Nordic region by others 2016-2021 ($ billions)
Exhibit 18: Global data center construction market by mechanical construction (% share)
Exhibit 19: Global data center construction market by mechanical construction 2016-2021 ($ millions)
Exhibit 20: Data center construction market in the Nordic region by cooling solutions 2016-2021 ($ millions)
Exhibit 21: Data center construction market in the Nordic region by racks 2016-2021 ($ millions)
Exhibit 22: Data center construction market in the Nordic region by others 2016-2021 ($ millions)
Exhibit 23: Data center tier levels
Exhibit 24: Data center construction market in the Nordic region by tier standards 2016-2021 (% share)
Exhibit 25: Data center construction market in the Nordic region by tier standards 2016-2021 ($ billions)
Exhibit 26: Data center construction market in the Nordic region by Tier 1 and Tier 2 standards 2016-2021 ($ billions)
Exhibit 27: Data center construction market in the Nordic region by Tier 3 standards 2016-2021 ($ billions)
Exhibit 28: Data center construction market in the Nordic region by Tier 4 standards 2016-2021 ($ billions)
Exhibit 29: Data center construction market segmentation by country 2016-2021 (% share)
Exhibit 30: Data center construction market in Denmark 2016-2021 ($ billions)
Exhibit 31: Data center construction market in Norway 2016-2021 ($ billions)
Exhibit 32: Data center construction market in Sweden 2016-2021 ($ billions)
Exhibit 33: Data center construction market in Finland and Iceland 2016-2021 ($ millions)