Report Overview
Equis Group (EQUIS), through its subsidiaries Redaya Energi and PT Energi Bayu Jeneponto is undertaking the construction of a wind farm in Jeneponto, South Sulawesi, Indonesia.
The project involves the construction of a 72MW wind farm. It will include the construction of a substation and access roads, the installation of 20 turbines each 3.6MW, installation of generators and transformers, and the laying of 150kv transmission lines.
Mott MacDonald is appointed as the consultant that provides construction and operations monitoring services.
On February 24, 2017, EQUIS signed an engineering, procurement, and construction (EPC) and an operations and maintenance (O&M) contracts with Siemens Group and PT Siemens Indonesia in Consortium with PT Pembangunan Perumahan (Persero) Tbk.
In the second quarter of 2017, Siemens Gamesa has secured an order from Equis Energy to supply 20 gearless SWT-3.6-130 wind turbines with 3.6 MW each for the project.
On February 22, 2018, project achieved financial closure.
Construction activities are underway and the project is expected to be completed by the end of second quarter 2018.
Table Of Contents
1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix