GM – Alexis Road Transmission Plant Expansion – Ohio - Project Profile

  • Category : Construction & Manufacturing
  • Published On : April   2018
  • Pages : 5
please select format
 
Synopsis
"GM – Alexis Road Transmission Plant Expansion – Ohio - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "GM – Alexis Road Transmission Plant Expansion – Ohio - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.
Scope
The project involves the construction of a 60,480m2 transmission plant in Toledo, Ohio, the US.

The US$668 million project includes the following:

1. Construction of 51,190m2 of manufacturing space in the west side facility

2. Construction of 9,290m2 of manufacturing space in the south side facility

3. Construction of production units

4. Construction of warehouses

5. Construction of a raw material storage facility

6. Construction of packing units

7. Construction of distribution units

8. Installation of machinery and equipment

9. Construction of related infrastructure
Summary
General Motors Company (GM) is expanding its transmission plant in Toledo, Ohio, the US.

The project involves the construction of a 60,480m2 transmission plant. It includes the construction of 51,190m2 of manufacturing space in the west side facility, 9,290m2 of manufacturing space in the south side facility, production units, warehouses, a raw material storage facility, packing units, distribution units and related infrastructure, and the installation of machinery and equipment.

In October 2016, GM filed an application with the Toledo-Lucas County Plan Commission.
Reasons To Buy
• Gain insight into the project.

• Monitor the latest project developments.

• Identify key project contacts.
Key highlights

Table Of Contents
1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
10.General News, Project News
11.Appendix

List Of Tables
1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
10.General News, Project News
11.Appendix
List Of Figures
close

category