Lucidum - Silanguin Bay Coal-Fired Power Plant 300 MW - Zambales - Project Profile

  • Category : Construction & Manufacturing
  • Published On : June   2017
  • Pages : 6
please select format
 
Synopsis
"Lucidum - Silanguin Bay Coal-Fired Power Plant 300 MW - Zambales - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "Lucidum - Silanguin Bay Coal-Fired Power Plant 300 MW - Zambales - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.
Scope
The project involves the construction of a 300MW coal-fired power plant at Silanguin Bay in Zambales, the Philippines.

The US$600 million project includes the following:

1. Construction of chimneys
2. Construction of a powerhouse
3. Construction of a substation
4. Construction of coal storage tanks
5. Installation of turbines
6. Installation of steam generators
7. Installation of transformers
8. Laying of transmission lines
Summary
Lucidum Energy Inc (Lucidum) is planning to undertake the construction of a coal-fired power plant in Zambales, the Philippines.

The project involves the construction of a 300MW coal-fired power plant. It includes the construction of chimneys, a powerhouse, a substation, and coal storage tanks, the installation of turbines, steam generators, and transformers and the laying of transmission lines.

Approval for the grid impact study has been obtained from the Department of Energy (DOE).

Project cost will be funded through a combination of 60-40 debt-equity ratio.

PacificTech Solutions has been appointed to undertake the feasibility study.

Financing arrangements are being negotiated with two lenders and they’re waiting for the completion of the feasibility study.
Reasons To Buy
• Gain insight into the project.

• Monitor the latest project developments.

• Identify key project contacts.
Key highlights
1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix
close

category