TCHUCB - Tunchang Waste-To-Energy Plant - Hainan - Project Profile

  • Category : Construction & Manufacturing
  • Published On : April   2018
  • Pages : 6
please select format
 
Synopsis
"TCHUCB - Tunchang Waste-To-Energy Plant - Hainan - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "TCHUCB - Tunchang Waste-To-Energy Plant - Hainan - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.
Scope
The project involves the construction of a waste-to-energy plant in Tunchang, Hainan, China.

The US$37 million project includes the following:

1. Construction of a processing unit

2. Construction of a storage facility

3. Construction of a powerhouse

4. Construction of a substation

5. Installation of incinerator

6. Installation of turbine and generator set

7. Laying of transmission lines

8. Installation of safety equipment
Summary
Tunchang County Housing and Urban Construction Bureau (TCHUCB) is constructing a waste-to-energy plant in Tunchang, Hainan, China.

The project involves the construction of a waste processing capacity of 600 tonnes per day, a processing unit, a storage facility, a powerhouse and a substation, the installation of incinerator, turbine, generator set and equipment, and the laying of transmission lines.

The project will be developed in two phases. The first phase is designed to have a daily household waste processing capacity of 300 tonnes.

On December 2017, China Everbright International Limited have signed the franchise (BOT) agreement.

Pre-construction activities are underway.
Reasons To Buy
• Gain insight into the project.

• Monitor the latest project developments.

• Identify key project contacts.
Key highlights

Table Of Contents
1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
10.General News, Project News
11.Appendix
close

category